Feiteng
Tagħmir għat-tidwib tal-bitum DLT (mingħajr berner)
Tagħmir għat-tidwib tal-bitum DLT (mingħajr berner)
Thermal-Oil Heated Drum Bitumen Decanter Without Built-in Burner
Formola ta' kuntatt
Introduzzjoni tagħna DLT-Serje Bitum Melter, li jutilizza żejt termali għal tisħin preċiż. Dan it-tagħmir jiżgura kwalità ta 'tisħin superjuri b'effiċjenza għolja, dumping rapidu, u tħaddim faċli għall-utent. Jissimplifika l-produzzjoni, jimminimizza l-iskart u t-tniġġis tal-bitum. Id-disinn sleek tiegħu, it-tqassim kompatt, u l-prestazzjoni affidabbli jagħmluha ideali għat-tneħħija tal-barmil tal-bitum f'ambjenti tax-xogħol differenti. Aġġorna għad-decanter tal-bitum avvanzat tagħna llum għal effiċjenza mtejba.
Imla s-Soluzzjoni Tiegħek tal-Kostruzzjoni tat-Toroq:
- Esplora Boiler taż-Żejt Termali
- Esplora Tank tal-Ħżin tal-Bitum
Aqsam








DLT-10: The Economical Drum Decanter for Sites With a Thermal Oil Boiler
DLT-10 decants, melts, heats and pumps drum-packed bitumen continuously at 8–10 t/h, using hot thermal oil from your external boiler as the heating source. Because there is no built-in burner, it is the most economical drum decanter in the Feiteng lineup — the right choice when your asphalt plant or site already runs a centralized thermal oil heating system.
Why Contractors Choose DLT-10
-
Lower Cost, No Burner to Maintain
Using your existing thermal oil boiler (800,000 kcal reference capacity) removes the built-in heating system from the price — and from your maintenance list.
-
Continuous 8–10 t/h Decanting
32 drums per load move through the heating chamber on a hydraulic propulsion system, melting into a 20 m³ lower tank for uninterrupted pumping.
-
One 40 HQ Container, 17 kW
The 12 × 2.2 × 2.55 m unit loads into a single 40 HQ container and runs on approximately 17 kW — low freight cost, low power demand.
Which Feiteng Drum Decanter Fits Your Site?
Choose DLT when you already have a thermal oil boiler and want the most economical configuration. Want automatic drum loading? See the ZDLT Series. No boiler on site? The self-heating YDST Series has a built-in diesel burner. Melting bag-packed bitumen? See the DKLR and YDLR bag decanters.
Send us your bitumen package type, capacity and heating condition — our engineers will recommend the right configuration within 24 hours.
Pass 1 — Tmigħ tat-Tnabar
Feed opened drums into the decanter
Opened drums are placed onto the feeding rack by the drum lifting system. Feeding runs in parallel with melting — while one batch is heated inside the chamber, the next batch is being loaded. This overlap is what keeps DLT-10 output continuous at 8–10 t/h rather than batch-by-batch, so your downstream plant never waits for bitumen.
Pass 2 — Tisħin tal-Kamra
Mexxi t-tnabar mill-kamra tat-tisħin ta' fuq
The hydraulic propulsion system advances drum plates step by step through the upper heating chamber, where thermal oil coils wrap each drum in even, indirect heat. The gradual advance gives every drum a complete heating cycle — bitumen releases cleanly from the drum walls and empty drums exit with minimal residue, which means less wasted bitumen per drum.
Pass 3 — Vaska tat-Tidwib
Dewweb il-bitum fil-kamra t'isfel
Released bitumen drops into the 20 m³ lower chamber, which works as both melting pool and buffer storage. Thermal oil coils hold the pool at a stable temperature, so the downstream pump always receives bitumen in a consistent, pumpable state — even if drum feeding pauses for a shift change or reload.
Pass 4 — Filtrazzjoni u Ippumpjar
Ippompja 'l barra lejn tank tal-ħażna
At pumping temperature, bitumen passes the in-line slag filter, which automatically traps drum debris and impurities. The bitumen pump then transfers clean liquid bitumen to your storage tank or asphalt plant — protecting downstream pumps, valves and spray equipment from blockage and cutting maintenance stops.
Komponenti Prinċipali
-
Melting Tank (20 m³)
Stores and heats bitumen during decanting and melting, supporting continuous liquid bitumen supply.
-
Thermal Oil Heating System
Transfers heat from your external boiler to the upper heating chamber and lower melting chamber.
-
Hydraulic Propulsion System
Jimbotta l-pjanċi tat-tnabar mill-kompartiment tat-tisħin għal tmigħ kontinwu tat-tnabar waqt it-tħaddim.
-
Apparat tat-Tqallib tat-Tnabar
Supports drum handling and decanting, improving bitumen removal and reducing manual handling.
-
Pompa tal-Bitumen u Filtru
The pump transfers melted bitumen while the in-line filter removes slag and impurities from the circulation pipeline.
-
Sistema tal-Kontroll Elettriku
Controls the operating sequence, hydraulic propulsion, heating and pumping — approximately 17 kW total power.
Key Technical Parameters
Core specifications of the DLT-10 drum bitumen decanter without burner.
| Parameter | Specification |
|---|---|
| Model | DLT-10 |
| Equipment Type | Drum bitumen decanter without built-in burner |
| Heating Source | External thermal oil boiler required |
| Production | 8–10 t/h |
| Applicable Condition | Bitumen softening point ≤55 °C; average ambient temperature ≥25 °C |
| Tank Volume | 20 m³ |
| Drum Quantity | 32 drums at 500 mm drum diameter |
| Dimension | 12 × 2.2 × 2.55 m |
| Container Loading | Loads into 1 × 40 HQ container |
| Total Power | Approximately 17 kW |
| Thermal Oil Boiler Capacity Needed | 800,000 kcal |
DLT-10 has no built-in burner — pair it with an external thermal oil boiler or your existing hot oil system. Final specifications are confirmed with your quotation.
Applikazzjonijiet
-
Sistemi tal-Provvista tal-Bitumen fit-Tnabar
Jiddekanta, jdub u jippompja l-bitumen ikkonsenjat fit-tnabar kontinwament qabel l-użu fi proġetti tat-toroq.
-
Preparazzjoni tal-Bitumen fl-Impjant tal-Asfalt
Ipprepara bitumen likwidu qabel l-impjanti tat-taħlit tal-asfalt jew it-tankijiet tal-ħażna b'filtrazzjoni awtomatika tal-gagazza.
-
Siti b'Sistemi Ċentrali taż-Żejt Jaħraq
Ideal where a thermal oil boiler already serves storage tanks and pipelines — one heat source for the whole bitumen system.
Matching Equipment for DLT-10
-
Thermal Oil Boiler
View Thermal Oil BoilerRequired external heat source for DLT-10 — reference capacity 800,000 kcal. Feiteng supplies matched boilers.
-
Tank tal-Ħżin tal-Bitum
Ara t-Tank tal-Ħażna tal-BitumStores melted bitumen after decanting and holds working temperature for plant feeding or project use.
-
Magna tat-Tidwib tal-Bitumen fil-Boroż
Ara l-Magna għat-Tidwib tal-Bitum f'BorożQabbel is-sistemi tat-tidwib ta' FEITENG għal formati differenti ta' imballaġġ tal-bitumen, inkluż bitumen fit-tnabar u fil-boroż.
Mibni minn FEITENG — 15+ Sena ta' Esportazzjoni ta' Tagħmir tal-Bitumen
Feiteng melting equipment has been delivered to Taiwan, the Maldives, Mongolia, Uganda and more — alongside storage tanks supplied to the Wirtgen Group. Every unit ships with a one-year quality warranty, online commissioning support, and engineer dispatch on request.
Bitumen melting equipment delivered to Taiwan →
Bitumen melting system delivered to the Maldives →
Lista ta' Kontroll tal-RFQ
For an exact DLT-10 quotation, tell us: required decanting capacity, drum diameter, bitumen softening point, ambient temperature, available thermal oil boiler capacity and working temperature, power supply, downstream storage volume, site layout, container shipping requirements, destination port and project timeline.
DLT-10 FAQ
What is the DLT-10 used for?
Continuous drum bitumen decanting, melting, heating and pumping before transfer to storage tanks, asphalt plants or downstream bitumen equipment.
Does the DLT-10 include a built-in burner?
No. DLT-10 uses hot thermal oil from an external boiler — that is why it costs less than self-heating models. If you need built-in heating, see the YDST Series.
What production capacity does DLT-10 support?
8–10 t/h when the bitumen softening point is ≤55 °C and average ambient temperature is ≥25 °C.
How many drums can the DLT-10 handle?
32 drums per load at 500 mm drum diameter. Tell us your drum spec for an exact loading figure.
X'Inhuma t-termini ta' ħlas?
Usually T/T: 30% down payment, balance before delivery. L/C is also accepted. Trade terms: EXW, FOB, CFR and CIF.
Kemm idum iż-żmien tal-kunsinna?
About 20 days of production time after the down payment is received.
What warranty and after-sales support do you provide?
One-year quality warranty after delivery, with online support included. We can also dispatch engineers for installation, commissioning and operator training.
X'Għandu jiġi kkonfermat qabel il-kwotazzjoni?
Capacity, drum diameter, bitumen softening point, external boiler capacity, voltage, site layout, downstream storage, container shipping requirement and destination port.
Get a DLT-10 Quotation Within 24 Hours
Kategoriji Relatati tal-Prodotti
-
Magni tat-Tidwib tal-Bitum
Feiteng tforni magni tat-tidwib tal-bitum u tagħmir ta 'dekanting tal-bitum għal bitum...
-
Tank tal-Ħżin tal-Bitum
Skopri t-tankijiet u s-sistemi Feiteng għall-ħażna tal-bitum u tal-asfalt għall-kostruzzjoni tat-toroq, impjanti...
-
Boiler taż-żejt termali
Feiteng jipprovdi bojlers taż-żejt termali u sistemi ta 'tisħin taż-żejt tat-trasferiment tas-sħana...