Feiteng
Dekanter għall-bitum f'boroż DKLR (mingħajr berner)
Dekanter għall-bitum f'boroż DKLR (mingħajr berner)
External Thermal-Oil Heated Bag Bitumen Melter Without Built-in Burner
Formola ta' kuntatt
Deskrizzjoni
Id-Decanter tal-Bag tal-Bitum tas-Serje DKLR huwa soluzzjoni avvanzata ddisinjata biex idub b'mod effiċjenti l-bitum ippakkjat f'boroż. Bl-użu ta 'bojler taż-żejt termali, issaħħan kontinwament il-koljaturi biex jiddewweb il-bitum solidifikat fi stat imdewweb, li mbagħad jista' jiġi estratt faċilment.
Dan id-decanter huwa ideali għal postijiet b'bojlers taż-żejt termali adattati u kapaċità ta 'tisħin biżżejjed.
Imla s-Soluzzjoni Tiegħek tal-Kostruzzjoni tat-Toroq:
- Esplora Boiler taż-Żejt Termali
- Esplora Tank tal-Ħżin tal-Bitum
Aqsam







DLR: Melt One-Ton Bag Bitumen at 8–10 t/h With Your Existing Boiler
DLR converts 1 × 1 × 1 m bag-packed bitumen into pumpable liquid bitumen at 8–10 t/h, using hot thermal oil from your external boiler. Hoisting, feeding, melting, filtering and pumping are integrated on one 11.9 m unit with a ≥32 m³ heated storage section — the economical choice for projects supplied with bag bitumen that already run a hot oil system.
Għaliex il-Kuntratturi Jagħżlu DLR
-
Mibni għal Boroż ta' Tunnellata
The 2-ton electric hoist, top feeding ports and buffer device are sized specifically for 1 × 1 × 1 m bag bitumen — no improvised lifting rigs, no manual block-breaking.
-
Lower Cost, No Burner
Heating comes from your external thermal oil boiler, so you skip the built-in heating system — and the machine runs on ≤11 kW total power.
-
Tidwib + Ħażna f'Unità Waħda
The ≥32 m³ heated tank holds melted bitumen at temperature, buffering supply between melting batches and downstream pumping — in many setups it replaces a separate small storage tank.
Liema Magna għat-Tidwib tal-Bitum f'Boroż FEITENG Taqbel mas-Sit Tiegħek?
Choose DLR when your site already has a thermal oil boiler and you want the most economical bag melter. Need self-contained heating? The YDLR Series brings its own diesel burner and thermal oil system. Melting drum-packed bitumen instead? Compare the DLT, ZDLT and self-heating YDST drum decanters.
Send us your bitumen package type, capacity and heating condition — our engineers will recommend the right configuration within 24 hours.
Pass 1 — Erfigħ tal-Boroż
Erfa' l-boroż ta' tunnellata bil-parank integrat
The 3 kW electric hoist (2-ton capacity) with its 0.4 kW walking motor lifts each bag and travels it to the top feeding port — no crane or forklift tied up at the melter. One operator handles the whole lifting cycle from the pendant control.
Pass 2 — Tmigħ
Niżżel il-blokok tal-bitumen mill-portijiet tat-tmigħ
Operators cut the bag bottom and the bitumen block drops through the feeding port onto the buffer device, which absorbs the impact and guides the block into the tank. The buffer is what makes feeding safe and repeatable — no splashing, no shock loads on the tank structure.
Step 3 — Thermal Oil Melting
Melt with external thermal oil above 200 °C
Seamless-steel thermal oil coils (57 × 3.5 mm) transfer heat from your boiler through the tank, while 100 mm rock wool insulation and the corrugated steel outer wall keep that heat inside. Indirect oil heating melts the blocks evenly without scorching the binder at the coil surface.
Pass 4 — Filtrazzjoni u Ippumpjar
Iffiltra u ppompja fit-tank tal-ħażna tiegħek
Once bitumen passes 110 °C pumping temperature, the 3QGB 80×2-46 three-screw pump moves 24 m³/h on 7.5 kW through the in-line filter, which traps bag debris and impurities. Clean liquid bitumen arrives at your storage tank or plant — and your downstream valves stay clear.
Komponenti Prinċipali
-
Tank tat-Tidwib Rettangolari
5 mm Q235B carbon steel inner wall with channel-steel reinforcement — ≥32 m³ melting and storage capacity.
-
Parank Elettriku (2 t)
3 kW hoist with 0.4 kW walking motor lifts one-ton bags to the feeding position.
-
Portijiet tat-Tmigħ + Apparat ta' Buffer
Jiggwida l-blokok tal-bitumen b'mod sikur fit-tank, u jipproteġi l-istruttura u l-operaturi waqt it-tmigħ.
-
Thermal Oil Coils
57 × 3.5 mm GB/T8163 seamless steel pipe transfers boiler heat evenly through the bitumen.
-
Pompa bi Tliet Viti + Filtru
3QGB 80×2-46 pump (24 m³/h, 7.5 kW) with in-line filtering for clean bitumen transfer.
-
Insulazzjoni + Sistema tal-Kontroll
100 mm rock wool insulation keeps heat in; the electric control system runs hoist, heating and pumping — ≤11 kW total.
Key Technical Parameters
Core specifications of the DLR bag bitumen melting machine without burner.
| Parameter | Specification |
|---|---|
| Product Name | DLR Bag Bitumen Melting Machine Without Burner |
| Equipment Type | External thermal-oil heated bag bitumen melter |
| Application | One-ton bag bitumen melting and heating (bag size 1 × 1 × 1 m) |
| Heating Source | External thermal oil boiler required (hot oil above 200 °C) |
| Production Rate | 8–10 t/h (ambient temperature above 25 °C) |
| Bitumen Storage Capacity | ≥32 m³ |
| Bitumen Pump | 3QGB 80×2-46 three-screw pump, 24 m³/h, 7.5 kW |
| Bitumen Pumping Temperature | Above 110 °C |
| Electric Hoist | 3 kW hoist + 0.4 kW walking motor, 2-ton lifting capacity |
| Inner Tank Wall | 5 mm Q235B carbon steel plate, channel steel reinforcement |
| Lower Coil | 57 × 3.5 mm GB/T8163 seamless steel pipe |
| Insulation | 100 mm rock wool, 0.5 mm corrugated steel outer wall |
| Total Power | ≤11 kW |
| Power Supply | 440 V / 50 Hz (other voltages on request) |
| Outer Size | 11.9 × 2.25 × 2.55 m |
DLR has no internal heat source — pair it with an external thermal oil boiler. Final voltage and configuration are confirmed with your quotation.
Applikazzjonijiet
-
Reġjuni tal-Bitumen fil-Boroż
In markets where bitumen arrives in one-ton bags rather than drums or bulk, DLR turns bag stock into plant-ready liquid supply.
-
Siti b'Sistema taż-Żejt Jaħraq
Where a thermal oil boiler already serves tanks and pipelines, DLR plugs into the same heat source — one boiler, whole system.
-
Ħażna u Tmigħ tal-Impjant
Feed asphalt mixing plants or storage tanks with filtered liquid bitumen, using the built-in ≥32 m³ tank as a supply buffer.
Tagħmir Mqabbel għas-Sistemi tat-Tidwib tal-Boroż DLR
-
Thermal Oil Boiler
View Thermal Oil BoilerRequired external heat source for the no-burner DLR configuration. Feiteng supplies matched boilers.
-
Tank tal-Ħżin tal-Bitum
Ara t-Tank tal-Ħażna tal-BitumJaħżen il-bitumen imdewweb wara l-iskariku u jżomm it-temperatura għal provvista kontinwa lill-impjant jew lill-proġett.
-
Drum Bitumen Decanter
View Drum DecanterQabbel is-soluzzjonijiet tat-tidwib fil-boroż u fit-tnabar skont il-format tal-imballaġġ tal-bitumen u l-loġistika tiegħek.
Mibni minn FEITENG — 15+ Sena ta' Esportazzjoni ta' Tagħmir tal-Bitumen
Feiteng bag decanting equipment has been delivered to Mongolia, Taiwan, the Maldives, Uganda and more — alongside storage tanks supplied to the Wirtgen Group. Every unit ships with a one-year quality warranty, online commissioning support, and engineer dispatch on request.
Bitumen bag decanter delivered for highway construction in Mongolia →
Lista ta' Kontroll tal-RFQ
For an exact DLR quotation, tell us: bag bitumen size, target melting capacity, available thermal oil boiler capacity and working temperature, power supply, project ambient temperature, storage tank volume, site layout, shipping limits, and whether the equipment connects with an asphalt plant or other processing system.
Mistoqsijiet Frekwenti DLR
Għal xiex tintuża l-magna għat-tidwib tal-bitum f'boroż DLR?
Melting and heating one-ton bag bitumen, then pumping filtered liquid bitumen to storage tanks, asphalt plants or downstream equipment.
Does this equipment include a burner?
No. DLR is heated by external thermal oil — that is why it costs less than self-heating models. If you need built-in heating, see the YDLR Series.
Liema daqs ta' borża timmaniġġja?
Standard 1 × 1 × 1 m one-ton bags. Tell us your actual bag package for the final feeding design.
X'Inhi r-rata ta' produzzjoni?
8–10 t/h when ambient temperature is above 25 °C — actual output depends on bitumen grade, thermal oil temperature and site operation.
X'Inhuma t-termini ta' ħlas?
Usually T/T: 30% down payment, balance before delivery. L/C is also accepted. Trade terms: EXW, FOB, CFR and CIF.
Kemm idum iż-żmien tal-kunsinna?
About 20 days of production time after the down payment is received.
What warranty and after-sales support do you provide?
One-year quality warranty after delivery, with online support included. We can also dispatch engineers for installation, commissioning and operator training.
X'Għandu jiġi kkonfermat qabel il-kwotazzjoni?
Capacity, bag size, external boiler capacity, power supply, site layout, downstream storage, destination port and control options.
Ikseb Kwotazzjoni DLR fi Żmien 24 Siegħa
Kategoriji Relatati tal-Prodotti
-
Magni tat-Tidwib tal-Bitum
Feiteng tforni magni tat-tidwib tal-bitum u tagħmir ta 'dekanting tal-bitum għal bitum...
-
Tank tal-Ħżin tal-Bitum
Skopri t-tankijiet u s-sistemi Feiteng għall-ħażna tal-bitum u tal-asfalt għall-kostruzzjoni tat-toroq, impjanti...
-
Boiler taż-żejt termali
Feiteng jipprovdi bojlers taż-żejt termali u sistemi ta 'tisħin taż-żejt tat-trasferiment tas-sħana...