Μελέτη Περιπτώσεων
Explore FEITENG bitumen equipment projects for road construction and asphalt processing. These published project reports describe equipment supplied to Brazil, Vietnam and India, covering bitumen melting, emulsion production, heated storage and rubber-modified asphalt processing.
Use the summaries below to find a project with a similar material-handling process, then open the full report for its equipment description. A previous installation is a reference for discussion; the configuration for a new project depends on the feed material, required output, heating supply and site conditions.
Featured equipment projects
Brazil: bitumen emulsion production and heated storage
This project combined an emulsified asphalt plant with an asphalt storage tank. The published report describes the customer's need to produce an asphalt emulsion while maintaining a supply of heated binder for road construction. It covers the equipment arrangement, temperature control and storage requirements considered in the supply.
Read the Brazil emulsion plant and storage tank project.
Vietnam: drum melting and asphalt emulsion equipment
The Vietnam project brought together barrel asphalt melting equipment and an emulsified asphalt plant. It is relevant to projects that receive solid bitumen in drums and need a melting stage before downstream processing. The report describes the heating and material-handling equipment supplied, together with the emulsion production equipment.
Read the Vietnam drum melting and emulsion equipment project.
India: rubberized asphalt production and development tanks
This project supplied rubberized asphalt production and development tanks for an Indian customer. The report discusses the customer's processing requirements and the role of mixing, heating and insulation in the equipment configuration. It provides a project reference for buyers considering a rubber-modified asphalt processing system.
Read the India rubberized asphalt tank project.
Find equipment for your process
- Bitumen melting equipment for preparing solid binder for processing.
- Bitumen storage tanks for heated storage and binder supply.
- Bitumen emulsion plants for emulsion production.
- Modified bitumen equipment for modified binder processing.
Discuss a similar project
When requesting an equipment proposal, include the bitumen packaging format or feed condition, intended process, required throughput, storage needs, available heating source and installation location. These details help establish which equipment and supporting connections need to be considered together.