In a large-scale asphalt mixing plant or a port terminal, storage capacity often dictates the continuity of operations. However, when facing a behemoth with a diameter of nearly 10 meters and a capacity of 500 tons, the core pain point is never just "how much it can hold."

Instead, the critical questions for a Chief Engineer are:

  1. "How fast can it transform cold bitumen into a usable state?"

  2. "Can it maintain absolute structural safety through tens of thousands of thermal expansion cycles?"

Today, we are conducting an X-ray level deconstruction of the Feiteng 500m³ Vertical Thermal Oil Heated Bitumen Tank. We will penetrate the Q235B steel plates to reveal the fluid logic and structural philosophy within.


I. Micro-Mechanics of Structural Engineering: Beyond Just "Big"

When many procurement managers see "500 cubic meters," they first think of the footprint. But as engineers, our primary concern is the challenge Hydrostatic Pressure poses to the tank walls.

In Feiteng's production plan, the tank features a diameter of 9.7 meters and a height of 7.4 meters. Using steel plates of uniform thickness for such dimensions would not only waste material but also create stress weak points at the bottom.

1. The Commercial Logic of Graduated Wall Thickness

The equipment is constructed by welding 5 tiers of Q235B Carbon Steel plates from bottom to top. However, the thickness is not uniform; it follows a precise graduated design:

  • Bottom Tier (High Stress Zone): 8mm (Actual measured approx. 7.75mm)

  • Middle Tiers: 6mm / 5mm

  • Top Tier: 4mm

Engineer’s Interpretation: This "thick bottom, thin top" design is not merely for cost control—it is a precise response to Pascal's Law. The 8mm bottom wall must withstand the immense lateral pressure generated by 500 tons of liquid bitumen plus the self-weight of the structure. This design ensures that under full-load conditions, the lower part of the tank does not suffer from plastic deformation (the "Elephant Foot" buckling phenomenon), directly extending the service life and reducing the risk of leakage due to weld seam cracking.

2. The Logistics Game of Site-Assembly

Unlike capsule tanks that fit into containers, a tank with a 9.7-meter diameter cannot be transported via standard land freight. Feiteng’s solution explicitly states: "Welding tank, NOT fixed by screws."

What does this mean? It means Feiteng provides not just equipment, but a set of on-site manufacturing process standards. Compared to bolted assembly tanks, a Fully Welded Structure eliminates the risk of micro-leakage caused by gasket aging. In bitumen storage, any tiny leak can evolve into a massive safety hazard under long-term high temperatures.


II. Thermodynamic Core: The 700-Meter "Vascular System" & 20m³ "Pacemaker"

For a 500m³ tank, the biggest nightmare is "Thermal Inertia"—heating 500 tons of bitumen typically takes days. Feiteng solves this pain point with two core technologies: the Super-Long Serpentine Coil and Local Heating Technology.

1. Matrix Layout of 700m Seamless Steel Pipes

The tank integrates approximately 700 meters of thermal oil coils, utilizing Φ57×3.5mm GB/T8163 Seamless Steel Pipes.

  • Layer 1 (Physical): The standard "GB/T8163" is key. This is the national standard for seamless steel pipes for fluid transport, meaning the pipes have undergone strict hydraulic testing. The 3.5mm wall thickness strikes a balance between thermal conductivity efficiency and abrasion resistance.

  • Layer 2 (Application): The 700-meter pipeline provides a massive heat exchange area of 125.3 m². More importantly, the system is divided into 4 independent circulation paths, each controlled by independent valves.

  • Layer 3 (Commercial): This redundant design means that even if one coil group is accidentally blocked or needs maintenance, you can still use the remaining 3/4 heating capacity to maintain production. You will never face a "paralyzed" bitumen terminal due to a single point of failure. This is the System Robustness required for large-scale engineering.

2. The 20m³ Local Heater: An ROI Multiplier

This is one of the most ingenious designs of this equipment. Inside the 500m³ tank, a 20m³ Local Heater (Bitumen High Temperature Area) is integrated near the outlet.

  • The Pain Point: Your paving crew needs 20 tons of bitumen tomorrow morning, but the 500 tons in the tank are currently at 110°C (poor fluidity). Heating the entire 500 tons for just 20 tons is an astonishing waste of energy.

  • The Solution: The Local Heater is a "tank-within-a-tank" structure. You only need to circulate thermal oil into this 20m³ zone to heat this specific portion of bitumen to 160°C for pumping in a very short time, while the surrounding 480 tons remain in a low-temperature insulation state.

  • Commercial Value: This technology cuts energy costs by over 90% for intermittent operations. The fuel savings from this feature alone in one year could potentially offset half the cost of the tank manufacturing.


III. Hidden Works: Secrets Beneath the Foundation

Most equipment suppliers only talk about what's above ground, but we must focus on the underground. The production plan specifies the foundation construction details:

  • Structure: 50cm Gray Soil + 50cm Concrete.

  • Critical Detail: 12cm Arch at the Center.

Why the "Arch"? Bitumen inevitably contains mud and sand impurities, which settle at the bottom over time. If the tank bottom is flat, impurities spread evenly and are hard to clean. The 12cm central arch, combined with the asphalt sand cushion, gives the tank bottom a slight convex shape. This guides sediments to accumulate towards the periphery or designated drain outlets. Simultaneously, this arch structure effectively resists stress tearing caused by foundation settlement, preventing the bottom plate from deforming or fracturing under thousands of tons of pressure.


IV. The 100mm Defense Line

In terms of insulation, the equipment employs 100mm thick High-Density Rock Wool, wrapped in 0.5mm Corrugated Color Steel.

Do not underestimate this 100mm. In cold outdoor environments (such as Russia or Northern China), every additional 10mm of insulation means saving thousands of kilocalories of heat loss per ton of bitumen daily. For Modified Bitumen that requires constant temperature maintenance 24/7, this "thermal blanket" is the final line of defense for reducing Operational Expenditure (OpEx).


Conclusion: Selection Logic for Industrial Assets

Feiteng's 500m³ Vertical Tank is not just a simple metal container. From the structural safety of the graduated wall thickness to the fault-tolerant design of the 4-path coils, and the energy-saving strategy of the 20m³ local heater, every parameter represents a deep consideration of "Continuous Production" and "Life Cycle Cost (LCC)."

If your project requires establishing a strategic bitumen reserve while maintaining the flexibility for daily small-batch output, this hybrid design offering "Large Capacity & Fast Response" is undoubtedly the current best practice.

Want to learn more about the on-site assembly process or the matching thermal oil heating solutions for this tank? [Contact Our Engineering Team Today]

Επιστροφή στο ιστολόγιο

Contact Us